Ge-industrial-solutions Spectra Series Power Panelboards 30–200 Ampere Fus Manuel d'utilisateur

Naviguer en ligne ou télécharger Manuel d'utilisateur pour Équipement Ge-industrial-solutions Spectra Series Power Panelboards 30–200 Ampere Fus. GE Industrial Solutions Spectra Series Power Panelboards 30–200 Ampere Fusible Switch User Manual Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 2
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
g
Spectra Series™ Power Panelboards
30–200 Ampere Fusible Switch
WARNING: Dan
g
er of electrical shock or in
j
ur
y
.
Turn
OFF
p
ower ahead of the
p
anelboard or
switchboard before workin
g
inside the
e
q
ui
p
ment or removin
g
an
y
com
p
onent. Do
not remove circuit
p
rotective devices or an
y
other com
p
onent until the
p
ower is turned
OFF.
General
To comply with the National Electrical Code and
Underwriters Laboratories, the Canadian Electrical Code
and the Canadian Standards Association, the load center
must be installed in accordance with the information
included on the label on the inside of the equipment.
This must also be done in accordance with the applicable
local electrical codes and by a qualified electrical
contractor or licensed electrician.
WARNING: Hazard of electrical shock or burn.
Turn off
p
ower su
pp
l
y
in
g
this e
q
ui
p
ment
before working inside.
Installation
Use the following instructions to install a 30–200 ampere
fusible switch.
1. Remove the mounting bracket. Remove the two screws
shown in Figure 1 and remove the mounting bracket
from the switch.
Figure 1. Removing the mounting bracket from the switch.
2. Mount the removable mounting bracket. Install the
mounting bracket (removed from the switch in step 1)
on the power panelboard with the two self-tapping
screws provided, as shown in Figure 2. Tighten the
screws to 27–32 in-lb.
Figure 2. Installing the mounting bracket in the panelboard.
3. Install the switch. Align the locating hook tabs on the
bottom of the switch into the square holes in the
support rails on the panelboard interior, as shown in
Figure 3. Open the switch door and reattach the
screws removed in step 1 to the mounting bracket
installed on the panel in step 2. Tighten the screws to
27–32 in-lb.
Figure 3. Switch locating tabs aligned in the panelboard interior.
GEH5548 Installation Instructions R02
Mounting
Bracket
Screws
Mounting
Screws
Locating
Tabs
Vue de la page 0
1 2

Résumé du contenu

Page 1 - Installation

gSpectra Series™ Power Panelboards30–200 Ampere Fusible SwitchWARNING: Danger of electrical shock or injury.Turn OFF power ahead of the panelboard

Page 2 - Systems Only

4. Wire the circuits. Refer to the label inside for theswitch cover for the proper tightening torques.5. Filler plates. Install filler plat

Commentaires sur ces manuels

Pas de commentaire