INTRODUCTION
GE Conversion Kits are designed for upgrading
existing I-T-E®/ABB® low-voltage power circuit
breakers, rather than replacing the entire breaker.
The Conversion Kits include MicroVersaTrip Plus™
or MicroVersaTrip PM™ Trip Units, the latest tech-
nological advance in GE trip systems.
MicroVersaTrip Plus and MicroVersaTrip PM Conver-
sion Kits are designed and tested to conform to ANSI
Standard C37.59, allowing the retrofitter to properly
install the kit and acceptance test the breaker.
This publication covers installation of
MicroVersaTrip Plus and MicroVersaTrip PM Con-
version Kits on I-T-E/ABB Types K-3000, K-3000S, K-
4000, and K-4000S low-voltage power circuit break-
ers. Each Conversion Kit contains all the components
needed to convert from the existing trip system.
g
MicroVersaTrip Plus™ and
MicroVersaTrip PM™ Conversion Kits
for I-T-E
®
/ABB
®
Types K-3000, K-3000S, K-
4000,
and K-4000S Low-Voltage Power Circuit
Breakers
DEH–133B Installation Instructions
Vue de la page 0
1 2 3 4 5 6 ... 27 28

Résumé du contenu

Page 1 -

INTRODUCTIONGE Conversion Kits are designed for upgradingexisting I-T-E®/ABB® low-voltage power circuitbreakers, rather than replacing the entire brea

Page 2 - TABLE OF CONTENTS

10Solid State Trip Device Removal (K-3000Sand K-4000S only)1. Remove the seven mounting screws from thefront escutcheon, as shown in Figure 17, and li

Page 3 - LIST OF FIGURES

114. Remove the retaining clip from the centermounting post of each line and load draw-outprimary contact finger assembly, as shown inFigure 20, then

Page 4

12Installing the Phase Sensors (All Models)1. Slide the CT spacer over each load-side copperstab of the breaker, as illustrated in Figure 23.2. Slide

Page 5 - SECTION 3. BACK FRAME BREAKER

13SECTION 4. FRONT FRAMECONVERSIONThe front frame conversion of an I-T-E/ABB typeK-3000, K-3000S, K-4000, or K-4000S circuit breakerconsists of the

Page 6

14Installing the Flux Shifter1. Remove and discard the existing hex-head boltand locking hex nut from the right-pole closingarm, as shown in Figure 27

Page 7 - Insulating

154. Connect the flux shifter reset arm to the resetstud using the X washer provided, as shown inFigures 31 and 32.CAUTION: Seven X washers are suppli

Page 8

16Adjusting the Flux ShifterWhen the trip paddle and flux shifter have beeninstalled, the following adjustments must be made:1. With the breaker in th

Page 9

17Installing the Trip Unit Wiring HarnessThe wiring harness includes a 36-pin connector,shown in Figure 34, that must be assembled andinstalled onto t

Page 10 - Figure 18. Arc chute removal

183. Slide the adapter bracket and connector assem-bly over the guide pins of the trip unit bracket.Press the two steel push nuts provided onto thegui

Page 11 - 16-18 x 1

19Installing the Trip Unit Bracket1. Secure the trip unit bracket assembly and theauxiliary switch mounting plate to the breakerwith the three 1/4-20

Page 12 - 2" screws, lock

2TABLE OF CONTENTSSECTION 1. GENERAL INFORMATION...

Page 13 - CONVERSION

203. When the communications and/or the neutral CTwiring are installed, tie these leads to the front ofthe breaker where they will be accessible in th

Page 14 - Installing the Flux Shifter

21SECTION 5. INSTALLING THE TRIPUNITThe trip unit is attached to the trip unit mountingbracket. Guide pins in the bracket mate with theholes on either

Page 15

22SECTION 6. FOUR-WIRE GROUNDFAULT OPTIONThe ground fault option for four-wire installationsrequires the installation of an additional currentsensor o

Page 16 - Adjusting the Flux Shifter

23SECTION 7. TESTING AND TROUBLE-SHOOTINGWARNING: Do not change taps on the current sen-sors or adjust the trip unit settings while thebreaker is carr

Page 17

243. Verify that the wiring harness connections to thesensors have the proper polarity (white lead tocommon, black lead to tap), as shown in thecablin

Page 18

25Figure 46. Cabling diagram for MicroVersaTrip Plus™ and MicroVersaTrip PM™ trip units with ground fault on four-wire loads.

Page 21

These instructions do not cover all details or variations in equipment nor do they provide for every possiblecontingency that may be met in connection

Page 22 - FAULT OPTION

3LIST OF FIGURES1. I-T-E/ ABB breaker before conversion. ...

Page 23 - SHOOTING

4SECTION 1. GENERAL INFORMATIONGE Conversion Kit installation is straightforward, butdoes require careful workmanship and attention tothese instructio

Page 24

5SECTION 3. BACK FRAME BREAKERCONVERSIONThe back frame conversion of an I-T-E/ABB typeK-3000, K-3000S, K-4000, or K-4000S circuit breaker,as shown i

Page 25

63. Remove the nine mounting screws securing theauxiliary switch mounting plate to the breaker, asshown in Figure 4. Remove the mounting plate.CAUTION

Page 26

76. To remove the phase barriers on each phase,push the moving contact assembly and theadjustment screw toward the rear of the breaker,then pull the p

Page 27

89. The stationary and moving contact assembliesmust be separated from the original molded baseassembly. Remove the eight hex-head mountingbolts, as s

Page 28 - GE Industrial Systems

95. Remove the two mounting screws securing thetrip paddle for the right pole assembly to thecommon trip shaft, as shown in Figure 15. Dis-card the tr