DEH-023 Installation Instructions
MicroVersaTrip
®
Plus and
MicroVersaTrip
®
PM
Conversion Kits
For Westinghouse
®
Types DS-206, DSL-206,
DS-416, DSL-416, DS-420, DS-632
Low Voltage Power Circuit Breakers
INTRODUCTION
GE Conversion Kits are designed to upgrade
existing Westinghouse
®
Low Voltage Power
Circuit Breakers, rather than replacing the entire
breaker. The Conversion Kits contain enhanced
solid-state MicroVersaTrip
®
Plus or
MicroVersaTrip
®
PM Trip Units, representing the
latest technological advancement in GE trip
systems.
MicroVersaTrip
®
Plus and MicroVersaTrip
®
PM
Conversion Kits are designed and breaker tested to
conform to ANSI Standard C37.59, allowing the
retrofitter to properly install and acceptance test
the breaker.
This publication covers the installation of
MicroVersaTrip
®
Plus and MicroVersaTrip
®
PM
Conversion Kits on Westinghouse
®
Types DS-
206, DSL-206, DS-416, DSL-416, DS-420, and
DS-632 Low Voltage Power Circuit Breakers.
Each Conversion Kit contains all appropriate
material to convert from an existing solid-state trip
system.
Vue de la page 0
1 2 3 4 5 6 ... 19 20

Résumé du contenu

Page 1 - INTRODUCTION

g DEH-023 Installation Instructions MicroVersaTrip® Plus and MicroVersaTrip® PM Conversion Kits For Westinghouse® Types DS-206, DSL-206, DS-416

Page 2 - TABLE OF CONTENTS

SECTION 4 INSTALLING THE CONVERSION KIT (CONTINUED) Wire Harness Connector Assembly and Installation The wire harness includes a 36-pin progr

Page 3

SECTION 4 INSTALLING THE CONVERSION KIT (CONTINUED) Wire Harness Connector Assembly and Installation (Continued) Step 3. Slide the adapter br

Page 4 - Trip Device Removal

SECTION 4 INSTALLING THE CONVERSION KIT (CONTINUED) Programmer Bracket Installation Step 1. Install the programmer bracket to the auxiliary s

Page 5

SECTION 4 INSTALLING THE CONVERSION KIT (CONTINUED) Wire Harness Installation (Continued) A mounting plate is supplied with each hardware kit

Page 6 - Trip Actuator Disassembly

Fig. 21. Programmer Installation SECTION 6 FOUR-WIRE GROUND FAULT OPTION The ground fault option in all four-wire systems requires an addition

Page 7

SECTION 6 FOUR-WIRE GROUND FAULT OPTION (CONTINUED) Step 3. Step 2. Route the wire through the equipment and connect to the 2-pin connect

Page 8

GROUND FAULT OPTION (CONTINUED) Fig. 23. Neutral Sensor Outline for DS-416, DSL-416 and DS-420 Breakers SECTION 6 FOUR-WIRE GROUND FA

Page 9

17 Once the breaker has been converted, but before it is energized, it must be tested. See below for testing and troubleshooting details. Testing B

Page 10 - Installation

18 SECTION 7 TESTING AND TROUBLESHOOTING (CONTINUED) False Tripping Breakers Equipped with Ground Fault When nuisance tripping occurs on brea

Page 11 - Installation (Continued)

(CONTINUED) Fig. 25. Cabling Diagram - MicroVersaTrip® Plus and MicroVersaTrip® PM with Ground Fault on 4-Wire Load 19

Page 12 - Wire Harness Installation

2 TABLE OF CONTENTS Page SECTION 1 GENERAL INFORMATION…………………………………………………………... 3 SECTION 2 PRIOR TO INSTALLATION…………………………………………………………… 3 SECT

Page 13 - Step 2

20 These instructions do not purport to cover all details or variations in equipment nor to provide for e

Page 14 - GROUND FAULT OPTION

3 SECTION 1 GENERAL INFORMATION GE Conversion Kit installation is straightforward, but does require careful workmanship and attention to these instr

Page 15

SECTION 3 BREAKER PREPARATION Preparing a Westinghouse® DS type breaker (Fig. 1) for conversion consists of the following steps: 1. Removing th

Page 16

SECTION 3 BREAKER PREPARATION (CONTINUED) Step 2. Separate the front escutcheon cover of the breaker by removing the charging handle knob, and f

Page 17 - Troubleshooting

SECTION 3 BREAKER PREPARATION (CONTINUED) Trip Actuator Disassembly The existing Westinghouse® trip actuator must be converted to the new MicroV

Page 18

SECTION 4 INSTALLING THE CONVERSION KIT Installing the Phase Sensors (CT’s) Step 1. The CT’s slide onto the breaker’s primary load stabs in the

Page 19

SECTION 4 INSTALLING THE CONVERSION KIT (CONTINUED) Flux Shifter Assembly, Adjustment and Installation The new MicroVersaTrip® flux shifter w

Page 20 - GE Industrial Systems

SECTION 4 INSTALLING THE CONVERSION KIT (CONTINUED) Flux Shifter Assembly, Adjustment and Installation (Continued) Step 3. Slide the actuator