Critical Power Installation Guide Service and Assistance - +1 877 546 3243 or +1 972 244 9288 [email protected] © 2013 General Electric Company.
NE-M Installation Guide H5692448 CC848815325 r06 May 2013 10 Frameworks Framework Description Figure 3 Frame - Full-Height Full-Height – Heav
NE-M Installation Guide H5692448 CC848815325 r06 May 2013 11 Controller – Pulsar Plus Figure 6 Pulsar Front Panel • Local or remote viewing and
NE-M Installation Guide H5692448 CC848815325 r06 May 2013 12 Aux Display - NE830A (Optional) The Aux Display is a voltage monitor that alarms whe
NE-M Installation Guide H5692448 CC848815325 r06 May 2013 13 Table 1 Rectifiers and Converters Rectifier/Converter Input Output Eco Compatible E
NE-M Installation Guide H5692448 CC848815325 r06 May 2013 14 Power Input Panel Power Input Terminal blocks in a front access panel at the bottom
NE-M Installation Guide H5692448 CC848815325 r06 May 2013 15 dc Distribution and Battery Termination Configuration Features Figure 12 DC Distri
NE-M Installation Guide H5692448 CC848815325 r06 May 2013 16 Installation Follow all site engineering instructions. This section is provided only
NE-M Installation Guide H5692448 CC848815325 r06 May 2013 17 Step Action Figure 14 Frame Mount Template 6 ft and 7ft Frames CAUTION: Health H
NE-M Installation Guide H5692448 CC848815325 r06 May 2013 18 Battery or Battery Stand Mounted Frame Step Action 1 Verify that battery or battery
NE-M Installation Guide H5692448 CC848815325 r06 May 2013 19 Step Action 1 Verify that the rack is positioned to provide adequate ventilation spa
NE-M Installation Guide H5692448 CC848815325 r06 May 2013 2 Table of Contents Table of Contents ...
NE-M Installation Guide H5692448 CC848815325 r06 May 2013 20 Battery or Battery Stand Mounted Frame If required by local code or practice, batter
NE-M Installation Guide H5692448 CC848815325 r06 May 2013 21 Install PV/AC Partition Kit – NE-M Eco systems only This section applies only to NE-
NE-M Installation Guide H5692448 CC848815325 r06 May 2013 22 Step Action 2 Apply labels onto PV/AC Partition as shown. • Place “PV WIRING” labe
NE-M Installation Guide H5692448 CC848815325 r06 May 2013 23 Step Action 8 Apply labels to the Input Panel chassis. • Place “PV Wiring” label o
NE-M Installation Guide H5692448 CC848815325 r06 May 2013 24 Figure 27 Rectifier and Shelf Numbering Figure 28 Rectifier Dual Feed Jumper Posi
NE-M Installation Guide H5692448 CC848815325 r06 May 2013 25 Step Action 2 Snap loose L1 and L2 plastic dividers on Input terminal blocks for eac
NE-M Installation Guide H5692448 CC848815325 r06 May 2013 26 Table 2 Conduit Size - Input Feed Rectifiers per Conduit Rectifiers per feed Min. Ex
NE-M Installation Guide H5692448 CC848815325 r06 May 2013 27 Install Batteries WARNING: Energy and Chemical Burn All batteries contain hazardous
NE-M Installation Guide H5692448 CC848815325 r06 May 2013 28 Step Action Notes: 1. Steps show four 12V batteries per shelf – one string of -48
NE-M Installation Guide H5692448 CC848815325 r06 May 2013 29 Connect Batteries Tray Mounted Batteries Go to the procedure for the disconnect meth
NE-M Installation Guide H5692448 CC848815325 r06 May 2013 3 Specifications and Application...
NE-M Installation Guide H5692448 CC848815325 r06 May 2013 30 Step Action 24V Battery Strings Connect the 2/0 cable between the V- post of the
NE-M Installation Guide H5692448 CC848815325 r06 May 2013 31 Anderson Connector Connection Step Action Figure 43 Anderson Battery Connector 1 C
NE-M Installation Guide H5692448 CC848815325 r06 May 2013 32 Direct to Battery Bus Connection Step Action Direct battery bus connections are not
NE-M Installation Guide H5692448 CC848815325 r06 May 2013 33 Step Action 24V Battery Strings Connect the factory-wired battery return cables t
NE-M Installation Guide H5692448 CC848815325 r06 May 2013 34 Step Action 3 Battery Cable Connections to External Shunt Panel (Battery only, not R
NE-M Installation Guide H5692448 CC848815325 r06 May 2013 35 Step Action 1 Verify that the measured voltage matches the bus label using a meter.
NE-M Installation Guide H5692448 CC848815325 r06 May 2013 36 6. Bullet Terminal distribution panels accept Bullet Terminal Circuit Breakers, TPS
NE-M Installation Guide H5692448 CC848815325 r06 May 2013 37 1-Pole and 2-Pole Breakers and TPS Fuse Holders 1 Secure Two-Pole adapter busses to
NE-M Installation Guide H5692448 CC848815325 r06 May 2013 38 Bolt-In Breakers Figure 57 Bolt-In Breakers 1 Assemble load bus bar to breaker usi
NE-M Installation Guide H5692448 CC848815325 r06 May 2013 39 Step Action 4 Verify the AC voltage supplied matches the AC input voltage of the rec
NE-M Installation Guide H5692448 CC848815325 r06 May 2013 4 Figure 46 Battery Cable Direct +24V ...
NE-M Installation Guide H5692448 CC848815325 r06 May 2013 40 Step Action – Pulsar Plus 1 Attach an ESD wrist strap or equivalent to the ESD groun
NE-M Installation Guide H5692448 CC848815325 r06 May 2013 41 Step Action – Pulsar Plus 3 Configure alarm relays to “Open On Alarm” or “Close On A
NE-M Installation Guide H5692448 CC848815325 r06 May 2013 42 Step Action – Pulsar Plus 5 Configure the 1-Wire serial bus reference The ES771 modu
NE-M Installation Guide H5692448 CC848815325 r06 May 2013 43 Step Action – Pulsar Plus 1 Analog Interface Connector Connect and wire to shunt and
NE-M Installation Guide H5692448 CC848815325 r06 May 2013 44 Step Action – Pulsar Plus 3 Auxiliary Input Connector Connect and wire auxiliary inp
NE-M Installation Guide H5692448 CC848815325 r06 May 2013 45 Step Action – Pulsar Plus 4 Output Alarm Connector Connect and wire remote alarm out
NE-M Installation Guide H5692448 CC848815325 r06 May 2013 46 Step Action – Pulsar Plus 6 Telephone Line Connection (Optional). Door-mount MODEM
NE-M Installation Guide H5692448 CC848815325 r06 May 2013 47 Figure 66 Millennium II Circuit Card - Field BSL Alarm Termination Board An insula
NE-M Installation Guide H5692448 CC848815325 r06 May 2013 48 Many systems are shipped with the appropriate controller connections wired by the fa
NE-M Installation Guide H5692448 CC848815325 r06 May 2013 49 Step Action – Millennium II 3 Alarm and Control Connections Connect and wire alarm a
NE-M Installation Guide H5692448 CC848815325 r06 May 2013 5 Introduction This manual is intended as a guide in assisting equipment understanding,
NE-M Installation Guide H5692448 CC848815325 r06 May 2013 50 Step Action – Millennium II 6 Local RS232 Serial Port Connector Connect notebook c
NE-M Installation Guide H5692448 CC848815325 r06 May 2013 51 Step Action 5 Open the faceplate by sliding the black latch to the left to release t
NE-M Installation Guide H5692448 CC848815325 r06 May 2013 52 Install Rectifiers • Refer to the controller manual for details of controller opera
NE-M Installation Guide H5692448 CC848815325 r06 May 2013 53 Verify Rectifier Positions Refer to site engineering instructions for rectifier type
NE-M Installation Guide H5692448 CC848815325 r06 May 2013 54 Figure 76 Main Screen - web Install Converters Repeat the above steps for converter
NE-M Installation Guide H5692448 CC848815325 r06 May 2013 55 Step Action 3 Apply appropriate terminals (if necessary) to the cable after removing
NE-M Installation Guide H5692448 CC848815325 r06 May 2013 56 Configure Controller – Minimum This section covers the basic operations that must be
NE-M Installation Guide H5692448 CC848815325 r06 May 2013 57 Step Configuration Attribute to Change Menu Path/Action - Pulsar Format This field
NE-M Installation Guide H5692448 CC848815325 r06 May 2013 58 Configure Millennium II Controller Figure 79 Front Panel - Millennium II Controller
NE-M Installation Guide H5692448 CC848815325 r06 May 2013 59 Step Configuration Attribute to Change Menu Path/Action = Millennium II Format This
NE-M Installation Guide H5692448 CC848815325 r06 May 2013 6 Product Description Infinity M (NE-M) is available in multiple system arrangements -
NE-M Installation Guide H5692448 CC848815325 r06 May 2013 60 Acceptance Testing NOTE: The controller may report a limited recharge alarm during
NE-M Installation Guide H5692448 CC848815325 r06 May 2013 61 Miscellaneous Alarms (Batteries must be connected) Distribution Alarms Step Action 1
NE-M Installation Guide H5692448 CC848815325 r06 May 2013 62 Manual Contactor Control and Alarms28 Step Action 1 Open the contactor by controlle
NE-M with Pulsar or Millennium II Installation Guide H5692448 CC848815325 r06 May 2013 63 Troubleshooting System Pulsar Controller Status
NE-M with Pulsar or Millennium II Installation Guide H5692448 CC848815325 r06 May 2013 64 Pulsar Controller Status Display Millennium Controller
NE-M with Pulsar or Millennium II Installation Guide H5692448 CC848815325 r06 May 2013 65 Pulsar Controller Status Display Millennium Controller
NE-M with Pulsar or Millennium II Installation Guide H5692448 CC848815325 r06 May 2013 66 Pulsar Controller Status Display Millennium Controller
NE-M with Pulsar or Millennium II Installation Guide H5692448 CC848815325 r06 May 2013 67 Pulsar Controller Status Display Millennium Controller
NE-M with Pulsar or Millennium II Installation Guide H5692448 CC848815325 r06 May 2013 68 Pulsar Controller Status Display Millennium Controller
NE-M with Pulsar or Millennium II Installation Guide H5692448 CC848815325 r06 May 2013 69 Pulsar Controller Status Display Millennium Controller
NE-M Installation Guide H5692448 CC848815325 r06 May 2013 7 Eco Capable Systems - Pulsar Plus only Eco capable systems (Eco systems) add support
NE-M with Pulsar or Millennium II Installation Guide H5692448 CC848815325 r06 May 2013 70 Rectifiers/Converters Status of a rectifiers and conver
NE-M with Pulsar or Millennium II Installation Guide H5692448 CC848815325 r06 May 2013 71 Table 11 Rectifier/Converter LEDs LEDs Condition Outpu
NE-M with Pulsar or Millennium II Installation Guide H5692448 CC848815325 r06 May 2013 72 Specifications and Application • Specifications and or
NE-M with Pulsar or Millennium II Installation Guide H5692448 CC848815325 r06 May 2013 73 Safety Safety Statements See equipment specifications f
NE-M with Pulsar or Millennium II Installation Guide H5692448 CC848815325 r06 May 2013 74 Precautions • Install, service, and operate equipment
NE-M with Pulsar or Millennium II Installation Guide H5692448 CC848815325 r06 May 2013 75 Achtung: Für kontinuierlichen Feuerschutz sollte die Si
NE-M with Pulsar or Millennium II Installation Guide H5692448 CC848815325 r06 May 2013 76 Revision History Issue Date Comment 1 2007 April In
NE-M Installation Guide H5692448 CC848815325 r06 May 2013 8 Figure 1 Block Diagram
NE-M Installation Guide H5692448 CC848815325 r06 May 2013 9 Components • Frameworks: • Full-Height Frame • Half-Height Frame • Sub-frame wit