Critical Power
Installation Guide
Service and Assistance - +1 877 546 3243 or +1 972 244 9288 PE.TechSupport@ge.com
© 2013 General Electric Company. All rights reserved. www.gecriticalpower.com
CC848815325 Issue 06 May 2013 1
H5692448 Power Systems
Infinity M
1
(NE-M)
with
Galaxy Millennium™ II Controller
or
Galaxy Pulsar™ Plus Controller
and Eco Capability
Issue 6 and later of this manual cover all NE-M systems, replacing CC848845333 NE-M with Millennium II Installation
Guide.
Issue 5 and earlier of this manual covered only NE-M with Pulsar Plus.
1
Trademark of General Electric Company
Pulsar Plus Controller
equipped
Millennium II Controller
equipped
Vue de la page 0
1 2 3 4 5 6 ... 75 76

Résumé du contenu

Page 1 - (NE-M)

Critical Power Installation Guide Service and Assistance - +1 877 546 3243 or +1 972 244 9288 [email protected] © 2013 General Electric Company.

Page 2 - Table of Contents

NE-M Installation Guide H5692448 CC848815325 r06 May 2013 10 Frameworks Framework Description Figure 3 Frame - Full-Height Full-Height – Heav

Page 3 - Table of Figures

NE-M Installation Guide H5692448 CC848815325 r06 May 2013 11 Controller – Pulsar Plus Figure 6 Pulsar Front Panel • Local or remote viewing and

Page 4 - Table of Tables

NE-M Installation Guide H5692448 CC848815325 r06 May 2013 12 Aux Display - NE830A (Optional) The Aux Display is a voltage monitor that alarms whe

Page 5 - Introduction

NE-M Installation Guide H5692448 CC848815325 r06 May 2013 13 Table 1 Rectifiers and Converters Rectifier/Converter Input Output Eco Compatible E

Page 6 - Product Description

NE-M Installation Guide H5692448 CC848815325 r06 May 2013 14 Power Input Panel Power Input Terminal blocks in a front access panel at the bottom

Page 7

NE-M Installation Guide H5692448 CC848815325 r06 May 2013 15 dc Distribution and Battery Termination Configuration Features Figure 12 DC Distri

Page 8 - Figure 1 Block Diagram

NE-M Installation Guide H5692448 CC848815325 r06 May 2013 16 Installation Follow all site engineering instructions. This section is provided only

Page 9 - Components

NE-M Installation Guide H5692448 CC848815325 r06 May 2013 17 Step Action Figure 14 Frame Mount Template 6 ft and 7ft Frames CAUTION: Health H

Page 10 - Frameworks

NE-M Installation Guide H5692448 CC848815325 r06 May 2013 18 Battery or Battery Stand Mounted Frame Step Action 1 Verify that battery or battery

Page 11 - Controller – Millennium II

NE-M Installation Guide H5692448 CC848815325 r06 May 2013 19 Step Action 1 Verify that the rack is positioned to provide adequate ventilation spa

Page 12 - Rectifiers and Converters

NE-M Installation Guide H5692448 CC848815325 r06 May 2013 2 Table of Contents Table of Contents ...

Page 13

NE-M Installation Guide H5692448 CC848815325 r06 May 2013 20 Battery or Battery Stand Mounted Frame If required by local code or practice, batter

Page 14 - Power Input Panel

NE-M Installation Guide H5692448 CC848815325 r06 May 2013 21 Install PV/AC Partition Kit – NE-M Eco systems only This section applies only to NE-

Page 15

NE-M Installation Guide H5692448 CC848815325 r06 May 2013 22 Step Action 2 Apply labels onto PV/AC Partition as shown. • Place “PV WIRING” labe

Page 16 - Installation

NE-M Installation Guide H5692448 CC848815325 r06 May 2013 23 Step Action 8 Apply labels to the Input Panel chassis. • Place “PV Wiring” label o

Page 17

NE-M Installation Guide H5692448 CC848815325 r06 May 2013 24 Figure 27 Rectifier and Shelf Numbering Figure 28 Rectifier Dual Feed Jumper Posi

Page 18 - Sub-frame Mounted Systems:

NE-M Installation Guide H5692448 CC848815325 r06 May 2013 25 Step Action 2 Snap loose L1 and L2 plastic dividers on Input terminal blocks for eac

Page 19 - Ground Frame

NE-M Installation Guide H5692448 CC848815325 r06 May 2013 26 Table 2 Conduit Size - Input Feed Rectifiers per Conduit Rectifiers per feed Min. Ex

Page 20

NE-M Installation Guide H5692448 CC848815325 r06 May 2013 27 Install Batteries WARNING: Energy and Chemical Burn All batteries contain hazardous

Page 21

NE-M Installation Guide H5692448 CC848815325 r06 May 2013 28 Step Action Notes: 1. Steps show four 12V batteries per shelf – one string of -48

Page 22

NE-M Installation Guide H5692448 CC848815325 r06 May 2013 29 Connect Batteries Tray Mounted Batteries Go to the procedure for the disconnect meth

Page 23 - Connect Input Power

NE-M Installation Guide H5692448 CC848815325 r06 May 2013 3 Specifications and Application...

Page 24

NE-M Installation Guide H5692448 CC848815325 r06 May 2013 30 Step Action 24V Battery Strings Connect the 2/0 cable between the V- post of the

Page 25 - Divider

NE-M Installation Guide H5692448 CC848815325 r06 May 2013 31 Anderson Connector Connection Step Action Figure 43 Anderson Battery Connector 1 C

Page 26 - Install Battery Trays

NE-M Installation Guide H5692448 CC848815325 r06 May 2013 32 Direct to Battery Bus Connection Step Action Direct battery bus connections are not

Page 27 - Install Batteries

NE-M Installation Guide H5692448 CC848815325 r06 May 2013 33 Step Action 24V Battery Strings Connect the factory-wired battery return cables t

Page 28 - External Batteries

NE-M Installation Guide H5692448 CC848815325 r06 May 2013 34 Step Action 3 Battery Cable Connections to External Shunt Panel (Battery only, not R

Page 29 - Connect Batteries

NE-M Installation Guide H5692448 CC848815325 r06 May 2013 35 Step Action 1 Verify that the measured voltage matches the bus label using a meter.

Page 30

NE-M Installation Guide H5692448 CC848815325 r06 May 2013 36 6. Bullet Terminal distribution panels accept Bullet Terminal Circuit Breakers, TPS

Page 31

NE-M Installation Guide H5692448 CC848815325 r06 May 2013 37 1-Pole and 2-Pole Breakers and TPS Fuse Holders 1 Secure Two-Pole adapter busses to

Page 32

NE-M Installation Guide H5692448 CC848815325 r06 May 2013 38 Bolt-In Breakers Figure 57 Bolt-In Breakers 1 Assemble load bus bar to breaker usi

Page 33 - External Battery Connection

NE-M Installation Guide H5692448 CC848815325 r06 May 2013 39 Step Action 4 Verify the AC voltage supplied matches the AC input voltage of the rec

Page 34 - Connect Battery Probes

NE-M Installation Guide H5692448 CC848815325 r06 May 2013 4 Figure 46 Battery Cable Direct +24V ...

Page 35 - Connect Load Wiring

NE-M Installation Guide H5692448 CC848815325 r06 May 2013 40 Step Action – Pulsar Plus 1 Attach an ESD wrist strap or equivalent to the ESD groun

Page 36

NE-M Installation Guide H5692448 CC848815325 r06 May 2013 41 Step Action – Pulsar Plus 3 Configure alarm relays to “Open On Alarm” or “Close On A

Page 37

NE-M Installation Guide H5692448 CC848815325 r06 May 2013 42 Step Action – Pulsar Plus 5 Configure the 1-Wire serial bus reference The ES771 modu

Page 38 - Verify Installation

NE-M Installation Guide H5692448 CC848815325 r06 May 2013 43 Step Action – Pulsar Plus 1 Analog Interface Connector Connect and wire to shunt and

Page 39 - Install Controller

NE-M Installation Guide H5692448 CC848815325 r06 May 2013 44 Step Action – Pulsar Plus 3 Auxiliary Input Connector Connect and wire auxiliary inp

Page 40

NE-M Installation Guide H5692448 CC848815325 r06 May 2013 45 Step Action – Pulsar Plus 4 Output Alarm Connector Connect and wire remote alarm out

Page 41

NE-M Installation Guide H5692448 CC848815325 r06 May 2013 46 Step Action – Pulsar Plus 6 Telephone Line Connection (Optional). Door-mount MODEM

Page 42

NE-M Installation Guide H5692448 CC848815325 r06 May 2013 47 Figure 66 Millennium II Circuit Card - Field BSL Alarm Termination Board An insula

Page 43

NE-M Installation Guide H5692448 CC848815325 r06 May 2013 48 Many systems are shipped with the appropriate controller connections wired by the fa

Page 44

NE-M Installation Guide H5692448 CC848815325 r06 May 2013 49 Step Action – Millennium II 3 Alarm and Control Connections Connect and wire alarm a

Page 45

NE-M Installation Guide H5692448 CC848815325 r06 May 2013 5 Introduction This manual is intended as a guide in assisting equipment understanding,

Page 46 - Install Millennium II

NE-M Installation Guide H5692448 CC848815325 r06 May 2013 50 Step Action – Millennium II 6 Local RS232 Serial Port Connector Connect notebook c

Page 47 - BSL Alarm Termination Board

NE-M Installation Guide H5692448 CC848815325 r06 May 2013 51 Step Action 5 Open the faceplate by sliding the black latch to the left to release t

Page 48

NE-M Installation Guide H5692448 CC848815325 r06 May 2013 52 Install Rectifiers • Refer to the controller manual for details of controller opera

Page 49

NE-M Installation Guide H5692448 CC848815325 r06 May 2013 53 Verify Rectifier Positions Refer to site engineering instructions for rectifier type

Page 50 - Install BSM6 Modem

NE-M Installation Guide H5692448 CC848815325 r06 May 2013 54 Figure 76 Main Screen - web Install Converters Repeat the above steps for converter

Page 51

NE-M Installation Guide H5692448 CC848815325 r06 May 2013 55 Step Action 3 Apply appropriate terminals (if necessary) to the cable after removing

Page 52 - Install Rectifiers

NE-M Installation Guide H5692448 CC848815325 r06 May 2013 56 Configure Controller – Minimum This section covers the basic operations that must be

Page 53 - Verify Rectifier Positions

NE-M Installation Guide H5692448 CC848815325 r06 May 2013 57 Step Configuration Attribute to Change Menu Path/Action - Pulsar Format This field

Page 54 - Install Converters

NE-M Installation Guide H5692448 CC848815325 r06 May 2013 58 Configure Millennium II Controller Figure 79 Front Panel - Millennium II Controller

Page 55

NE-M Installation Guide H5692448 CC848815325 r06 May 2013 59 Step Configuration Attribute to Change Menu Path/Action = Millennium II Format This

Page 56 - Configure Pulsar Controller

NE-M Installation Guide H5692448 CC848815325 r06 May 2013 6 Product Description Infinity M (NE-M) is available in multiple system arrangements -

Page 57

NE-M Installation Guide H5692448 CC848815325 r06 May 2013 60 Acceptance Testing NOTE: The controller may report a limited recharge alarm during

Page 58

NE-M Installation Guide H5692448 CC848815325 r06 May 2013 61 Miscellaneous Alarms (Batteries must be connected) Distribution Alarms Step Action 1

Page 59

NE-M Installation Guide H5692448 CC848815325 r06 May 2013 62 Manual Contactor Control and Alarms28 Step Action 1 Open the contactor by controlle

Page 60 - Acceptance Testing

NE-M with Pulsar or Millennium II Installation Guide H5692448 CC848815325 r06 May 2013 63 Troubleshooting System Pulsar Controller Status

Page 61

NE-M with Pulsar or Millennium II Installation Guide H5692448 CC848815325 r06 May 2013 64 Pulsar Controller Status Display Millennium Controller

Page 62

NE-M with Pulsar or Millennium II Installation Guide H5692448 CC848815325 r06 May 2013 65 Pulsar Controller Status Display Millennium Controller

Page 63 - Troubleshooting

NE-M with Pulsar or Millennium II Installation Guide H5692448 CC848815325 r06 May 2013 66 Pulsar Controller Status Display Millennium Controller

Page 64 - V1 1000A

NE-M with Pulsar or Millennium II Installation Guide H5692448 CC848815325 r06 May 2013 67 Pulsar Controller Status Display Millennium Controller

Page 65 - 1000A

NE-M with Pulsar or Millennium II Installation Guide H5692448 CC848815325 r06 May 2013 68 Pulsar Controller Status Display Millennium Controller

Page 66

NE-M with Pulsar or Millennium II Installation Guide H5692448 CC848815325 r06 May 2013 69 Pulsar Controller Status Display Millennium Controller

Page 67

NE-M Installation Guide H5692448 CC848815325 r06 May 2013 7 Eco Capable Systems - Pulsar Plus only Eco capable systems (Eco systems) add support

Page 68

NE-M with Pulsar or Millennium II Installation Guide H5692448 CC848815325 r06 May 2013 70 Rectifiers/Converters Status of a rectifiers and conver

Page 69 - One or both of the QS871A

NE-M with Pulsar or Millennium II Installation Guide H5692448 CC848815325 r06 May 2013 71 Table 11 Rectifier/Converter LEDs LEDs Condition Outpu

Page 70 - Rectifiers/Converters

NE-M with Pulsar or Millennium II Installation Guide H5692448 CC848815325 r06 May 2013 72 Specifications and Application • Specifications and or

Page 71 - Voltage Temp (VT)-Probes

NE-M with Pulsar or Millennium II Installation Guide H5692448 CC848815325 r06 May 2013 73 Safety Safety Statements See equipment specifications f

Page 72

NE-M with Pulsar or Millennium II Installation Guide H5692448 CC848815325 r06 May 2013 74 Precautions • Install, service, and operate equipment

Page 73 - Safety Statements

NE-M with Pulsar or Millennium II Installation Guide H5692448 CC848815325 r06 May 2013 75 Achtung: Für kontinuierlichen Feuerschutz sollte die Si

Page 74 - Special Installation Notes

NE-M with Pulsar or Millennium II Installation Guide H5692448 CC848815325 r06 May 2013 76 Revision History Issue Date Comment 1 2007 April In

Page 75 - Español

NE-M Installation Guide H5692448 CC848815325 r06 May 2013 8 Figure 1 Block Diagram

Page 76 - Revision History

NE-M Installation Guide H5692448 CC848815325 r06 May 2013 9 Components • Frameworks: • Full-Height Frame • Half-Height Frame • Sub-frame wit