imagination at workEvolution Series E9000Motor Control CentersInstallation & Maintenance GuideDEH-40472 Rev. 05GE EnergyIndustrial Solutions
9Bus Splice KitsTable 2. Bus Splice KitsSplicing From / To E9000/E9000*Included in kits.Note: Standard plating is tin. Refer to factory for alternate
10Evolution Series E9000 Installation & Maintenance GuideFigure 16. Top conduit entry space for 20-inch and 22-inch sectionsTable 3. Dimensions fo
11Evolution Series E9000 Installation & Maintenance GuideWhere access to the rear of the section is available,cables can be brought into the space
12Evolution Series E9000 Installation & Maintenance GuideField connections to these control and load terminalsshould be made at the master termina
13height, order a blank filler door with hinge hardware anda snap shelf. See the renewal parts bulletin for orderingblank doors and gasket materials.
14Evolution Series E9000 Installation & Maintenance GuideFigure 26. Quarter-turn latch located at the bottom of the unit.Removal of Draw-Out Motor
15Evolution Series E9000 Installation & Maintenance GuideFigure 28. Concealed screw used to defeat the door interlock.Figure 29. The door cannot b
16Evolution Series E9000 Installation & Maintenance GuideFigure 32. Rotating the operating handle to access the breaker.Pilot Bracket and DoorThe
17Evolution Series E9000 Installation & Maintenance Guide
18Evolution Series E9000 Installation & Maintenance GuideChapter 4 – OperationPreparing for Initial OperationIn addition to the normal circuit che
1Evolution Series E9000 Installation & Maintenance GuideContentsWarnings, Cautions & Notes . . . . . . . . . . . . . . . . . . . . . . . . . .
19Evolution Series E9000 Installation & Maintenance Guide5. Close the main disconnects, if any, at the motorcontrol center.6. Close each branch-ci
20Evolution Series E9000 Installation & Maintenance GuideChapter 5 – MaintenanceEquipment MaintenanceThe customer should prepare a maintenance pro
21Evolution Series E9000 Installation & Maintenance GuideFigure 42. Pilot light and pushbutton removal tool, catalog number GEN-1684A.Figure 43. E
22Evolution Series E9000 Installation & Maintenance GuidePublications Available from GEOrder any of the following publications from yournearest GE
23Evolution Series E9000 Installation & Maintenance GuideOrdering Additional or Replacement PartsThe following information is needed for supplying
24Evolution Series E9000 Installation & Maintenance GuideChapter 6 – Overload HeatersHeaters for Ther-Mag Circuit Breaker ControllersFor continuou
25Evolution Series E9000 Installation & Maintenance GuideSize 5 (Standard and Ambient Comp.)Heaters for Mag-Break®ControllersThe Mag-Break protect
26Evolution Series E9000 Installation & Maintenance GuideSize 0 and 1 (Ambient Comp.)Size 2 (Standard)Size 2 (Ambient Comp.)Size 3 (Standard and A
27Evolution Series E9000 Installation & Maintenance GuideSize 3 (Standard and Ambient Comp.) cont.Size 4 (Standard)Size 4 (Ambient Comp.)Size 5 (S
28Evolution Series E9000 Installation & Maintenance GuideSize 0 and 1 (Ambient Comp.)Size 1 (Ambient Comp.)Size 2 (Standard)Size 2 (Ambient Comp.)
2DEH–40472Warnings, Cautions & NotesAs Used In This PublicationWARNINGSCAUTIONSNOTESThis document is based on information available at the time of
29Evolution Series E9000 Installation & Maintenance GuideSize 4 (Standard)Size 4 (Ambient Comp.)Size 4 (Standard)Size 4 (Ambient Comp.)Motor Full-
30Size 5 – 300:15 CT (Standard and Ambient Comp.)Size 6 – 600:5 CT (Standard and Ambient Comp.)Size 6 – 600:5 CT (Standard and Ambient Comp.)Overload
31Evolution Series E9000 Installation & Maintenance GuideSize 0 and 1 (Standard and Ambient Comp.)Size 1 (Standard and Ambient Comp.)➀ See maximum
32Evolution Series E9000 Installation & Maintenance GuideSize 3 (Ambient Comp.) Size 4 (Standard)Size 4 (Ambient Comp.)➀ See maximum fuse and sho
33Evolution Series E9000 Installation & Maintenance GuideHeaters for NEMA Size 6 and 7 Fused ControllersFor continuous-rated motors with a service
34Catalog numbers of electronic overloads for various sizes ofNEMA starters and current ranges.➀ 300:15 CT’s➁ 800:5 CT’sIEC Style Overload RelaysC2000
imagination at workGE Energy41 Woodford Avenue, Plainville, CT 06062www.geelectrical.com© 2010 General Electric CompanyDEH-40472 R05 07/10These instru
3This publication provides guidelines for installation andmaintenance of Evolution Motor Control Centers, asshown in Figure 1. The information provide
4Evolution Series E9000 Installation & Maintenance GuideGeneral Description – Motor Control Center BusesThe main horizontal power bus is located a
5Evolution Series E9000 Installation & Maintenance GuideChapter 2 – Receiving, Handling & StorageReceivingBefore leaving the factory, the moto
6Evolution Series E9000 Installation & Maintenance GuideChapter 3 – InstallationInstallation of Bottom Entry ConduitsConduits can be stubbed in af
7Evolution Series E9000 Installation & Maintenance GuideFigure 7C. Low bus position of ground and neutral bus (minimumavailable space for conduit
8Evolution Series E9000 Installation & Maintenance GuideAll cables entering the bottoms of sections should bepulled through conduits to a point wh
Commentaires sur ces manuels